A unique feature of RP 2FB is handling post-blast fire (the most common escalation). A blast may damage fireproofing, and subsequent fire can cause rapid failure. The PDF provides simplified methods for coupled analysis.

  • Acceptable damage levels:
  • Problem: Treating recommendations as non-binding suggestions.
    Reality: In litigation or incident investigation, "failure to follow an industry RP" is seen as negligence.


    For those looking into the technical meat of the document, API RP 2FB covers several critical areas: