Pr 402- Abu Dhabi Lighting Manual -

For engineers and contractors, here is the practical workflow:

  • Prepare the compliance documentation:
  • Submit to DMT / municipality – The approval process typically takes 2–4 weeks. Respond to all comments; resubmit revised calculations if needed.

  • PR 402 does not operate in a vacuum. A compliant design must also satisfy: pr 402- abu dhabi lighting manual

    Pro tip: Always request the “PR 402 – Lighting Design Coordination Matrix” from the municipality – a spreadsheet that cross-references all interfacing codes. For engineers and contractors, here is the practical


    Use professional software (Dialux, Relux, or AGi32). Model at least 3 consecutive poles and 1.5 pole spacings beyond. Output must include: Prepare the compliance documentation :